How we unpack, store and deliver glass facade panels in heavy stillages for a commercial facade contractor, across numerous Melbourne building projects, including Saturday site deliveries.
A commercial facade contractor needed heavy glass panels unpacked, stored safely and delivered to busy building sites in the installer’s sequence, often on Saturdays when the site has crane time and road space.
1
Containers of glass in stillages are collected from the wharf and brought to our depot.
2
Stillages are lifted out under cover with forklifts sized for their weight.
3
Panels stay in their stillages, stored inside and labelled by project and floor.
4
Each delivery is booked around the site’s crane time and the installer’s sequence.
5
Stillages are strapped onto our flat beds and delivered to site, Saturdays included.
6
Empty stillages and A-frames come back to our yard until they’re needed again.
Unpacked and stored under cover in the last 12 months.
Delivered to building sites across Melbourne.
From Port Melbourne and South Yarra to Cobblebank.
When the site has crane time and road space.
Customer
Commercial facade contractor
Projects
Five Melbourne building projects
Freight
Glass facade panels in stillages and A-frames
Delivery
Building sites across metro Melbourne, Saturdays included